Metal Shop Guide

Buyer guide · 2 min read · Updated Oct 27, 2026

Picking a metal finish

Five finishes side by side: what each one suits, how thick it is and how long it lasts.

Side by side

FinishWorks onTypical thicknessGood for
Powder coatSteel, stainless, aluminum1 to 4 milsColour, outdoor parts, wear
Liquid paintSteel, aluminum1 to 5 milsTouch ups, deep recesses
AnodizingAluminum, titaniumType II up to 0.001 inchColour and wear on aluminum
Hot dip galvanizingSteelAt least 3.9 mils on heavy shapesOutdoor steel for decades
Zinc platingSteelAbout 0.0003 inch per sideBolts, brackets, small parts

Powder coat

  • A dry powder, sprayed on and baked hard
  • Powder maker TIGER Drylac recommends at least 2.5 to 3.0 mils
  • One PPG powder passed 2,500 hours of salt spray. That's a lab test, not years outside.
  • Protocase allows 0.003 inch of powder per side when sizing holes

Anodizing

  • For aluminum and titanium only, never steel
  • Type II: 0.00007 to 0.001 inch, at one Ontario finisher
  • Type III, hard coat: 0.0005 to 0.0045 inch there
  • Colour adds time at SendCutSend: clear and black add 1 to 3 days, red, blue and gold 5 to 7

Hot dip galvanizing

  • Steel dipped in a bath of molten zinc
  • Heavy structural shapes get at least 3.9 mils of zinc under ASTM A123
  • The American Galvanizers Association's example: 72 to 73 years before first maintenance in an industrial setting
  • First maintenance means 5% of the steel shows rust
  • Right on the ocean, it can rust within 5 to 7 years

We found no hot dip plant in Ottawa. Corbec runs one in Lachine, near Montreal, with a 48 foot kettle. Trylon in Elmira, Ontario advertises 48 hour turnaround.

Zinc plating or galvanizing?

  • Zinc plating is a thin layer, about 0.0003 inch per side at SendCutSend
  • Hot dip galvanizing is far thicker: at least 3.9 mils on heavy shapes
  • Plating suits bolts, brackets and parts kept dry
  • Galvanizing suits steel that lives outside for decades

How long finishing takes

  • Outside finishing adds 7 to 10 business days at one Quebec fab shop
  • One Quebec plater: about 5 working days, 48 hour rush
  • Powder coating at one Ottawa shop: 5 to 7 business days

Sources

Get quotes from up to 3 powder coating shopsFree. One request.
Get quotes

Shops that do this

Powder coating in Ottawa

See all

Robadair

Ottawa 6 km

  • Metal fabrication
  • Sheet metal
  • Machining
  • +7

Precision metal fabrication, machining and sheet metal work for customers including defence, with welding, powder coating and chemical conversion finishing.

Certs
ISO 9001AS9100+3
Equipment
Trumpf TruLaser 3030 PlusTrumpf TruPunch 5000+4
Jobs
Takes small jobs
Since 1974 View shop

Hovey Industries

Ottawa 13 km

  • Sheet metal
  • Metal fabrication
  • Laser and plasma cutting
  • +4

Custom sheet metal fabrication, machining and powder coating for industrial, commercial and railway customers, from design and prototypes to production runs.

Certs
ISO 9001CWB W47.1
Equipment
Amada Laser FO 3015NTAmada Vipros 357 Punching Machine CNC+5
Jobs
Prototypes
Since 1979 View shop

Pryor Metals

Ottawa 13 km

  • Sheet metal
  • Metal fabrication
  • Bending
  • +2

Precision sheet metal manufacturing, forming, welding and powder coating for aerospace, electronics, construction and medical customers.

Certs
ISO 9001CWB W47.1+2
Equipment
CNC multi axis brakes
Jobs
Prototypes
Since 1979 View shop

Need something made?

One free request reaches up to 3 local shops that do the work.